Cement Grinding Plant Install The Test
Oct 26, 2017

Mud mill is the key equipment after the material is broken and then crushed. Ball mill is widely used in cement, silicate products, new building materials, refractories, fertilizers, black and nonferrous metal processing and glass ceramics and other production industries, all kinds of ore and other grinding materials for dry or wet grinding.

Cement mill has a strong adaptability to the material, can continue to produce, broken than large, easy to speed grinding products, such as the fineness of the characteristics. Cement mill can be produced either dry or wet. Can also be grinding and drying at the same time operations.

Installation and maintenance of cement mill

The maintenance of the machine is an extremely important part of the regular work, it should be extremely close to the operation and maintenance, should be full-time staff on duty check

Maintenance of the machine

1, the bearing bear the full load of the machine, so good lubrication on the bearing life has a great relationship, it directly affects the machine life and operating rate, which requires the injection of lubricants must be clean, the seal must be good, the machine Main oiling (1) Rotary bearings (2) Roll bearings (3) All gears (4) Movable bearings, sliding surfaces.

2, the new installation of the wheel prone to loose must be regularly checked.

3, pay attention to the work of the various parts of the machine is normal.

4, pay attention to check the wear parts of the wear and tear, pay attention to replace the wear parts.

5, put the activities of the chassis plane, should be out of dust and other objects in order to avoid the machine can not break the material when the activities of the bearings can not move on the chassis, resulting in serious accidents.

6, bearing oil temperature rise, should immediately stop the cause of the check to be eliminated.

7, rotating gear in the operation if the impact should immediately stop the inspection and eliminate.

Install the test

1, the equipment should be installed on the basis of the level of concrete, with anchor bolts.

2, the installation should pay attention to the main body and horizontal vertical.

3, after installation, check the various parts of the bolt without loosening and whether the mainframe door fastening, if any fastening.

4, according to the power of the device configuration power lines and control switches.

5, check is completed, the empty load test, the test can be normal production.

working principle

The machine is a cylindrical rotating device, external gear drive, two positions, lattice ball mill. Material from the feeding device through the feed hollow shaft screw evenly into the first warehouse, the warehouse has a ladder liner or corrugated liner, built-in different specifications of the ball, the cylinder rotation to produce centrifugal force to the ball to a certain height After the fall, the material hit and grinding effect. Material in the first warehouse to reach rough grinding, the single compartment through the plate into the second warehouse, the warehouse is set with a flat liner, there are steel balls, the material further grinding. The powder is discharged through the discharge grate to complete the grinding operation.